Post-construction cleaning is not an ordinary deep clean. Fine gypsum, cement, MDF and tile-cutting particles settle on ledges, inside tracks and across newly installed finishes. The work needs a staged top-to-bottom process, appropriate vacuuming and careful damp wiping rather than aggressive treatment of every mark.

When is the site ready for cleaning?
The best time to begin is after the main trades have finished and the site is safe to access. If drilling, sanding, cutting or painting continues during or after the clean, more dust and residue will be produced.
- Confirm that electricity and water are available.
- Remove builders’ waste, rubble and bulk packaging.
- Arrange parking, building access and lift protection.
- Identify delicate, newly installed or unfinished surfaces.
- Explain which contractors will remain active on site.
How fine construction dust is removed
A practical sequence starts with dry removal and suitable filtered vacuuming from high areas downward. Accessible surfaces are then damp-wiped using products and methods selected for the finish. Floors are vacuumed before damp mopping so loose grit is not dragged across the surface.
Typical areas covered
- Floors, skirting, doors, frames and accessible fixtures
- Kitchen surfaces, cupboards and built-in storage
- Bathrooms, sanitary ware and accessible tiled surfaces
- Wardrobes, shelves and drawers when cleared
- Internal glass and accessible window or sliding-door tracks
- Accessible ledges, switches, sockets and ironmongery
Paint, adhesive, grout haze and silicone residue
Fresh light residue may respond to careful treatment, but cured paint, adhesive, sealant, grout haze, cement bloom and silicone can require specialist chemicals or mechanical removal. Aggressive scraping can damage glass, stone, metal, sanitary ware and newly installed finishes, so these tasks must be assessed and agreed separately.
Can one visit make the property completely dust-free?
No. Fine construction dust can continue settling after cleaning, particularly while other trades remain active or ventilation systems circulate residual particles. A professional clean substantially reduces the dust load, but a completely dust-free result after one visit cannot be guaranteed. Light resettlement over the following days is normal.
What is normally excluded?
Builders’ waste removal, skip loading, repairs, snagging, removal of protective sheeting, external facade cleaning, rope access, cradle work, scaffolding, heavy mechanical scraping and specialist chemical treatment are excluded unless separately agreed in writing.
Protecting new finishes
Share manufacturer care instructions where available. Newly installed stone, wood, metal, glass and sanitary finishes can be vulnerable to scratches, etching or chemical reactions. The safest approach is to test where suitability is uncertain and to stop rather than risk permanent damage.
Requesting a quotation
Send the property size, project type, current site condition, expected trade-completion date, access information and photographs. Because post-construction sites vary widely, Fiza Prime confirms pricing after assessment rather than publishing an unsupported universal rate.